Every connection, from the very beginning.
We contributed engineering, electrical infrastructure and LV/MV installations to the Bekmezci Tarım egg production facility. The electrical needs of the production buildings were addressed as part of a site-wide project.
PROJECT SCOPE
- 01
Engineering
Designing the production facility’s electrical infrastructure and system connections.
- 02
Medium-voltage infrastructure
MV electrical infrastructure for the facility’s incoming power.
- 03
Low-voltage distribution
Installation of on-site electrical distribution and LV infrastructure.
- 04
Site installation
Electrical infrastructure work coordinated with the facility’s construction.