AETHER AIThe AI platform of 3M Elektrik Otomasyon

Your factory.
Shared intelligence.

Bring company data, from production and accounting to energy and stock management, together in your factory’s own AI data centre.

Glass-enclosed AI data centre and server racks within the factory production areaON-SITE AI DATA CENTRE
A shared company data centre, inside the production facility.Concept facility
MANUFACTURING · TRADE · AGRICULTURE · SERVICES

AETHER AI can be adapted to the needs of every sector. Existing software and data sources come together in one centre around your business needs.

01 / ORDER EXPERIENCE

One order.
The whole factory.

Follow the same order from inventory to machines, energy and accounting. Every step connects to the same record in the on-site AI centre.

DEMO-2701 · Sample product A · 27,000 unitsIllustrative data · Example scenario
SAME FACILITY / SAME ORDERMaterial intake
Illustrative facility showing material intake, production machines, energy infrastructure, offices and an on-site AI data centre AI

Illustrative facility · Data from the highlighted area connects to the on-site AI centre.

INSIDE YOUR FACTORY

AETHER AI data centre

The order number connects records across departments. Management sees production progress and costs for the same order together.

Explore the data centre in the factory ↗
Sufficient stock

Is there enough material for this order?

1,350 kg of Material A is planned for 27,000 units of Sample Product A. The allocated 1,500 kg covers the entire order.

Order quantity
27,000 units
Total material required
1,350 kg
Material allocated to order
1,500 kg
Used so far
1,243 kg
Remaining allocated stock
257 kg
Material for remaining production
107 kg
AETHER AI / EXAMPLE ASSESSMENT

There is 257 kg in stock against a remaining requirement of 107 kg. An estimated 150 kg will remain after the order.

Order record + inventory movements + part weight
01 / 04

02 / SHARED DATA

Different departments.
One picture.

Assess machine output, energy consumption and accounting impact together. Select a data source to see what reaches the centre.

INSIDE YOUR FACILITY

AETHER AI
data centre

A shared production recordMachine counters, cycle times, downtime and quality results come together in one production view.
03 / USE CASES

From data to
shared priorities.

Illustrative data · Example scenario
These examples show the management view created when data from different departments is considered together.

See downtime alongside its production impact.

Machine downtime, shift targets and quality results are assessed in one view.

Example next step: examine downtime causes and affected machines.

Machine records · Production plan · Quality control
Total shift downtime
18 minutes
Production
24,860 units
Target
27,000 units
Quality rate
%98,4
04 / IMPLEMENTATION

AI infrastructure
built for your facility.

Data sources and use cases are considered alongside the factory’s physical infrastructure.

  1. 01

    Needs assessment

    Data sources, priorities and use cases across production and company systems are identified.

  2. 02

    Data centre installation

    On-site server, power and network infrastructure is prepared around usage requirements.

  3. 03

    Data integration

    Machine and business-system data is brought together in a structure that supports joint analysis.

  4. 04

    Commissioning

    Data flows, user access and selected scenarios are checked before going live.